Current Position: Home >> Solutions >> Industry Solutions >> Petro-chemical

Petro-chemical

Collaborative platform simulates the whole process of underground downhole operation work , in order to achieve visual simulation process management, with the focus on well feedback problems , technical designs, construction designs , the completed inspection and acceptance , materials and construction costs of settlement, benefit evaluation and compilation of construction summary part of the work. As a result , it achieves tracking the whole process of information management under the same platform to address the construction of underground operations digital processing of historical data, ensuring permanent storage, achieving on-line inspection, clearing and benefit evaluation of integrated management, reflecting the whole process of underground operations to address the current management system is running underground operations of information technology issues.

Operation collaborative platform application for an oil factory for instance:

More than 40 million operations, 3 million business design accumulation, all construction since the digital information of precipitation since 1966, 46 million times' process examinations and approvals, three years of round-the-clock customer satisfaction, and countless times' report queries.

3359 copies of which geological design, 8311 copies engineering designs , 2183 copies design work , 5480 copies issue well information , 1290 Well time, 2689 copies operating progress.
(As of May 10, 2009 , data)

Status of before the operation:

1、Unable to hold the occurrence cost in course of fracturing , acidification and other implemening job plans , which is not conducive to control job cost ;

2、Job daily, process monitoring, claim identification and such goes through the paper form, unable to make site content reflected in the oversight log in time. Because they could not identificate and specificate of the result , we can't provide analysis on the increasing construction job cost;

3、Unable to achieve online reviews on implementing construction achievements, construction content , rod tube records and such , while we can't audit results as acceptance of the settlement, it is difficult to control the timeliness of data delivery and reliability;

4、As to process designs and approval of geological design turnaround process, involving multiple departments of dynamic audits,its process is very complex, especially in the construction of settlement units and production units run of the job group instigating the aspects of manual states ,which is difficult to accurately track to the handling of the entire process;

5、Involved acceptance and approval of settlement costs, because of a job summary of construction material costs as well as the construction cost acidification job summary statement and the oils, well hydrofracturing construction cost rollup table process involves the acceptance of settlement-related projects and construction units and cost categories, and also involved the relevant amount. As to the cost of control, the manual states , there is no way to management, budget management and control more can;

6、Unable to foresee the effect on oil wells and jobs , summarize or analyze according to different measures;

7、Unable to achieve online work arrangements and information feedback, with more meetings, the lack of timely delivery of information, which is not conducive to retrospective reviewing , monitoring or evaluating;

Collaborative platform for underground work, including 20 sub-systems:

1、 Formula preparation , approval and deployment of design management

Two design issued meanwhile , ensuring later acceptance processes. Formula designs include 14 kinds of geological scenario, 13 types of engineering programs, 8 construction plan online issues. At the same time , able to predict the effects on jobs. When construction is over, the online estimation occurs to the cost of materials and settlement, so does the evaluation of the effects on jobs;

2、 Benefits evaluation & Summary

Work on oil wells to predict the effect, and conduct to summarize and analyze according to different measures;

3、Well operation and management issues

Well realized the problem of online information delivery, including the issue of wells reporting, verification, daily newspaper issuing , completion statistics and so on. Issued by the Ministry in accordance with the production of oil wells to run the design and construction schedule, automatically run the table, clearly reflect the total number of wells everyday problems affecting the production conditions, construction progress, commissioning time and liquid, oil, water, water injection and so on.

4、Acceptance and balance management

General operating expenses, including construction , materials billing and fracturing the content of settlement costs, which pass through step by step reviewing to the competent authorities to enable them to grasp the process of program implementation costs of operating the occurrence, a help to control operating costs.

5、 Construction progress

Including daily operations, process monitoring, claims identification, etc.. It will supervise the content reflected in the supervision of the records, identify the cause of the operation and construction specifications , then identify results, the reasons for the analysis to provide the basis for operating cost's increasing.

6、 Construction summary preparation & Audit

It achieves online review on construction result, construction content, the contents of rod and tubing records, while the audit results as a basis for acceptance of settlement, timely transmission of information to facilitate control and reliability.

7、Classified report management

Forming classified reports according to the formula designs and construction progress, including the formation of classification report design and schedule for the report query, complete acceptance bulletin, task allocation statistics, the job budget, job cost warning and so on.

8、Work plans

Timely deployment,with the number of meetings reduced , information passes more timely and accurate , conducive to trace the inspection, supervision and evaluation.

9、Shared information

Including shotting (and supplying) hole information, problem well information , formula design information, construction summary information , investment and cost adjustment scheme, annual budget, annual job job summary and such information sharing.

10、Task reminding management

According to the login username getting the current user's tasks, with a message to remind the way each task in the pop-up window displaying to remind the user.

11、File Management Tools

Including rods, tubes, rods, tubes archives, in assur underground, archives, etc., providing basis for the design.

12、 High-risk well archives

Including high-risk area archive maintenance, high-risk area archive query, high-risk area archive statistical reports, high-risk area archive entry.

13、Acceptance of bulletin

Including wells complete statiscal tables, completed wells tables, unit acceptance of statistical tables, check table and so on.

14、 Perforation programme management

Including perforation note query, fill hole note queries, perforation project, project plan and so on.

15、 Rules , regulations and notices' publishing

The factory operation of laws and regulations is the showcase of well control, plant important information publishing platform. Notices can be set according to view units and users, production run department can grasp the users' viewing situation.

16、Operational plans

Divided into oil well measures of workload and maintenance workload scheduling, supporting annual 、monthly and quarterly statistics. Implementation of the operational plan of the whole process tracking, detailed to design each step processing staff 、time and construction.

17、 Operational dairy

Including operating daily data query, data insertion, data modification and deletion of the whole set of daily management processes.

18、 Operational monitor

Including the whole course of monitoring well work, the whole process monitoring oil well job and so on.

19、 Operational indicator

Divided into operation rework rate, the rate of wear, checked pump cycles, pump rate, rate of reassortant job indicators clearly reflected.

20、 Operationalquality

Including rework well reason, quality problem application , underground quality claims, claims fee list , job quality-related query 、 statistics and other features.

Technology and innovation:

1、Compared with traditional software development

Traditional software development methods: traditional software development methods, sets different identities by user , such as designing, reviewing and approval of human etc., with a large number of design hybrid circulations. Reviewer needs to find some copies of the task in their own work tasks, not real flow control. At the same time, unable to implement process tracking.

Application workflow technology development methods: application workflow technology job collaborative platform enables workflow customization and program code separation, user rights relative to a particular process set individually for each process can set different permissions; In tailoring process on every aspect of the deal, therefore, the task will be based on the process of setting sent to a designated approver tasks, who you do not have to find a lot of data to process their own tasks; When the process changed the task to run by the newly defined processes continue to flow, or by task the submitter or the administrator returned or restart the task; Thus for virtually automatic transfer process.

2、Process designs

Downhole collaborative platform includes project scenario, geological scenario, job scenarios, acceptance of the settlement, deployment, quality claim and such 13 classes 80 more flows of definition and design work, and on this basis, they are free to adjust, modify or enhance business processes.

3、Arithmetic research

Tube automatical drawing algorithm: According to downhole string of planning downhole tools map library, database technology and the corresponding code dynamically increase or by deleting the management, technicians the ability to automatically draw all types of string thumbnail to downhole string of Visual management.

4、Unique innovation in the storage management model design, database schema design, report system design and so on.

5、Innovation in technology:

(1).Based on workflow technology, standard operation procedures (2). Based on AJAX technology, the implementation of the no-refresh pipe designs (3). The application Graphics to draw pictures , connected with data (4). Implemention of form data UPS functions, ensuring data security (5).The implementation of the programme design review form of electronic signature (6). The application of AJAX technology, with operation complex form designs simplified (7). An application of XML technology, implementation of form data exchange (8). Taking advantage of Excel template technology for pit advanced report customization (9). Based on service-oriented architecture (SOA), providing WebService service (10). Supporting cross-system, cross-application integration

Functions and characteristics of the downhole collaborative platform :

1、 Based on A2 database

(1)The data source can rely on the A2 database or other databases

(2)The system has a data extraction functions, making it easier for users to directly extract A2 data

(3)The oil well's database doesn't adopt A2 database, users can tune to take its own database of other systems, such as Oracle, SQL or other data sources

2、Mature

(1)Three years of round-the-clock customer satisfaction, 3 million copies of business design accumulation, 46 million process running approvals, and countless report queryies

(2)Core workflow engine has been widely used in numbers of well-known enterprises, such as the Pepsi Asia-Pacific headquarters, Swiss Abbott, Johnson & Johnson China, Fuji Xerox, Ingram Micro China, Kraft Foods, General Mills, Singapore's Temasek Holdings , Guangdong Unicom, China United Engineering Corporation and so on.

3、Steady

Some of the clients run of more than millions of records in data amount

Some customers on this platform runs of core business, such as emergency project scheduling, etc.

Some customers on this platform runs of more than 10 billion RMB each year in marketing and approval of advertising fees.

Some customer owns more than 1.4 million users

Stability of this platform confirmed

4、Professional

(1)Ten years of experience on workflow technology research

(2)The first member of WfMC nationally

5、Usability

(1)Only if you are able to surf Internet

(2)Simple operation, user-friendly, easy-to-use and fast to get

6、Open

(1)The use of generic technologies and open standards , providing a comprehensive interface, like adapter, BPFC, BPO.Net interface, etc.

(2)Core workflow has already had extensive experience in real-life case studies of the interface engine with SAP, Oracle, JDE, QAD, BPCS, U8, kingdee's K3 and such ERP systems, moreover , American Express data, some HR softwares, TurboCRM, resource platform BOSS, BizTalk platform, MOSS and so on.

7、Extensibility

(1)Structured on workflow technology, you can build all kinds of applications

(2)Developed software allows the user to their integration with the platform

8、Security

(1)Processes and business drill-down management , such as in factories and mines can be managed by its own permissions, enabling downward cubic mode

(2)Strong security in the system login , transmission, process control, form access control, log, etc.

9、Performance efficiency

(1)Multiple servers, distributed processing, efficiency greatly improved

(2)Using disk arrays, enabling system fault-free operation around the clock

10、Maintainability

(1)B/S structure , customer duanling installation, with easier upgrade

(2)Business process changed, adjustment is very convenient

Functions and features of collaborative platform for underground work:

Simulation of operation in the whole process: downhole collaborative platform simulates of operation in the whole process, visual simulation process management, focusing on problem well feedbacks, technical designs, construction and design,job completion and acceptance, materials and construction cost, benefit evaluation and construction of such aspects of the work in the implementation on the same platform on job information for tracking and managing the whole process, resolve operation construction history data in digital processing to achieve permanent storage, enabling online acceptance, clear and effective evaluation of the integrated management, reflecting the job of the whole process that addresses the current underground jobs run management system.

Achieved data integration: With the help of collaborative platform through the implementation of downhole operation, they've established a construction aggregate benefit evaluation unit, operating schedule, problem oil well, geological designs, engineering design, operation designs, assignments, acceptance of settlement to achieve source integrated management of data flow.

Reduced manual transfer errors: Underground work business process automation greatly reduces the demands for paper-based documents, as well as transferring files additional manpower required in the process of burden and will not result in information delays caused by manual handling files. Visual process management tools for dynamic modeling of processes under the underground, all the processes operating in accordance with established rules passed to the relevant departments to implement or issue.

Standardized business processes: Through the implementation of the operation code for collaborative platform, the operation of a wide range of business processes, and process management with real-time performance, when the process changed the task to run by the newly defined process to continue, or by task the submitter or the administrator returned or restart the task.

Improved the efficiency of operation: Through the implementation of operation collaborative platform for flexibility to reflect and embody the operation of the construction process and results, the implementation of the operation of collaborative work, improved job productivity, enhancing the degree of information and oil enterprises under the new mode of operation.


Contact UsJobsPrivacy PolicyLegal PolicySitemap